







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cover Kitchen Remodeling: The Pasadena Owner’s Guide
If you’ve got a Cover kitchen that’s starting to show its age, a full remodel in Pasadena typically runs between $14,000 and $45,000 installed, depending on cabinet run length, counter surface, and how much plumbing or electrical we’re moving. That’s the real range, not a teaser number. Most Pasadena homeowners call us after living with a kitchen that works fine until it doesn’t: a cabinet face pulls loose, a sink base softens from a slow leak, or they’re just done with the layout they’ve been fighting for ten years.
We handle the whole job, top to bottom. No subbing out the tile to some crew you’ve never met. No mystery line items. You’ll get a written price before we pick up a single tool, and the number on the invoice is the number you approved. That’s how we’ve run every project through Sawyer Remodel Pasadena since 2005, under The Relay Visibility Guarantee.
Which Cover Models This Applies To

Cover kitchens are a newer breed: modular cabinet systems, flat-pack European styling, hardware that’s designed for clean vertical lines. The good news is the bones are predictable. The bad news is parts compatibility can bite you if you’re not careful. Cover cabinets use a 32mm system for hinge and drawer mounting – that’s the European bore spacing pattern, not the 35mm you’ll find on standard American frameless boxes. If someone tries to swap in a generic hinge or drawer slide without knowing that, the reveal gaps go crooked and the doors never sit right again.
We stock Cover-compatible cabinet hardware, drawer glides, and soft-close mechanisms on the service van, sourced as OEM where it matters – hinges and glides especially – and quality aftermarket equivalents where the OEM price is just paying for a label. For cabinet boxes and faces that are beyond repair, we order direct or cut custom replacements to match the existing finish. You leave the guesswork to us, and you don’t pay for a full re-box when a face frame replacement will do. Sawyer Remodel Pasadena is an independent contractor, not affiliated with Cover, but we’ve worked on enough of their kitchens in Pasadena to know exactly what’s behind the doors.
Styles & brands we work with







Signs Your Cover Kitchen Remodeling Is Failing
- Cabinet doors that won’t stay closed or sit crooked. The soft-close hinge has worn out or the mount screws have stripped in the particleboard. On Cover cabinets, overtightened screws are the usual culprit – the backing material is dense but unforgiving once the threads start to give.
- A drawer that sags or sticks halfway. The undermount glides are out of alignment or one side has jumped its track. This happens gradually and people usually just live with it until the drawer finally drops on their foot.
- Sink base cabinet feels soft or smells musty. There’s a slow leak at the supply line or the drain basket, and the cabinet floor has been soaking it up for months. By the time you notice it, the bottom panel is usually shot.
- Countertop seam or edge lifting near the cooktop. Heat cycling does this, especially with laminate or wood-edge tops in Pasadena’s dry, warm climate. The expansion and contraction will eventually crack the substrate if nobody addresses it.
- Finish wearing through on cabinet faces and drawer fronts. High-traffic areas – the trash pull-out, the silverware drawer – show it first. Cover’s thermofoil finishes hold up well for a decade, but once they start peeling, there’s no re-glue fix. You replace or refinish.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

A full Cover kitchen remodel in Pasadena lands between $14,000 and $45,000. Here’s how that breaks down on paper:
- Cabinet installation or full cabinet replacement: $4,000 – $13,000
- Countertop installation (including removal of the old surface): $2,000 – $6,500
- Backsplash installation: $800 – $2,500
- Kitchen island installation or rework: $3,000 – $10,000
The spread comes down to cabinet count, whether we’re doing a full gut-out or a face-lift, and what surfaces you pick. Cambria, Silestone, and Caesarstone countertops run toward the upper end of the counter line; a laminate top keeps you at the bottom. Every quote includes demo, haul-away, install labor, and our 365-Day Done Right Promise in writing: if it’s not done right, we make it right. A full year, no fine print, no argument.
DIY or Call Us?
You can oil hinges, tighten a loose drawer front, and swap a soft-close mechanism if you’re handy and you’ve got the right part in hand. That’s about where I’d stop. Kitchen remodeling involves plumbing, electrical, gas, and structural weight loads you don’t want to learn about the hard way. A countertop that’s not properly supported fails catastrophically, and a gas line mistake isn’t a “redo it next weekend” problem. As Luca Romano likes to say, the work tells you everything – you just have to know how to listen to it. If the bones are off, you need someone who knows what the work is saying.
If you’re in Pasadena and your Cover kitchen is failing, call (626) 657-5396. We’ll come look, tell you straight what’s repairable and what isn’t, and put a written price in your hand before we do anything else.
FAQs

A well-installed Cover kitchen in Pasadena’s climate will give you 12 to 20 years of steady use before the finish, hinges, and layout start working against you. Surface wear shows up first; structural failures – sink base rot, sagging boxes – show up sooner if there’s been water exposure. Call (626) 657-5396 and we’ll tell you honestly whether your kitchen has another five years in it or if you’re throwing good money at bad boxes.
Yes, if the boxes are sound we can replace faces, refinish surfaces, swap hardware, and install new counters without touching the frame work. It’s cheaper than a full rip-out. But if water or termites got to the cabinet carcasses, patching won’t hold – call us at (626) 657-5396 for a straight answer, not a sales pitch.
Most full Cover kitchen remodels run three to six weeks from first tear-out to final walkthrough, depending on cabinet lead times and whether we’re moving plumbing or electrical. The biggest schedule variable is material ordering; we order cabinets and surfaces up front so you’re not waiting on a short drawer base for two extra weeks. Call (626) 657-5396 for a timeline on your specific scope.
We stock Cover-compatible 32mm hinges, drawer glides, soft-close mechanisms, and mounting hardware on the service van, plus trim and fill pieces for the most common Cover cabinet lines. If it’s an oddball size or a discontinued finish, we source it same week. For KraftMaid and Wellborn cabinets we carry the same range, and we’re familiar with Cambria and Silestone surface specs too. Call (626) 657-5396 and ask what we’ve got on hand.
Written by Luca Romano, Owner & Lead Contractor, Sawyer Remodel Pasadena at Sawyer Remodel Pasadena, serving Pasadena and nearby areas.


