







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
KraftMaid Home Additions & ADU: The Pasadena Owner’s Guide
A KraftMaid home addition or ADU project in Pasadena typically runs $45,000 to $130,000 installed, with ADU-specific builds ranging from $90,000 to $220,000 depending on square footage, foundation work, and utility runs. We install and build with KraftMaid cabinetry on both additions and accessory dwelling units, and most Pasadena homeowners we meet are trying to figure out whether their existing KraftMaid-built space can be expanded or whether they need a full standalone structure. The short answer: it depends on your property’s setback lines, your foundation, and whether you’re extending roofline or going vertical. What KraftMaid owners usually discover first isn’t a single “part” failing. It’s a cascade: the cabinetry holds up beautifully, but the structure around it wasn’t built for what they’re now asking of it. Or they have KraftMaid cabinets in a garage conversion that’s now becoming a permitted ADU, and the city wants structural changes before they’ll sign off. We’ll walk through all of it.
Which KraftMaid Models This Applies To
KraftMaid doesn’t make “addition parts” the way they make cabinet hardware. What we’re working with on a home addition or ADU is the KraftMaid cabinetry you already own or want installed inside the new space. KraftMaid’s current lineup splits into their Vantage, Fountain, and Hartford lines, with the older Sedona and Crossing series still showing up regularly in Pasadena homes built or remodeled between 2005 and 2018. Why that matters: KraftMaid changed their box construction and hinge mounting standards around 2019, and older series don’t accept the current soft-close hinge retrofit kits without a face-frame modification. If you’re carrying existing KraftMaid cabinets into an addition or matching them to new boxes, we verify the series by the stamp inside the door frame, not the door style name on the order invoice. Pasadena adds its own wrinkle: most additions and ADUs here require Title 24 energy compliance and, in historic districts like Bungalow Heaven, design review. KraftMaid’s standard-depth upper cabinets at 12 inches don’t always clear the thicker insulated walls a Title 24 build demands. We’ve had to bump to 15-inch-deep uppers on more than one Pasadena job to keep cabinet clearance legal and functional. OEM KraftMaid boxes are worth it if you’re matching an existing run. For a standalone ADU kitchen, Wellborn or a KraftMaid Vantage line gives you comparable build quality at a friendlier lead time, and we’re happy to lay out both options side by side with prices so you decide with your eyes open.
Styles & brands we work with







Signs Your KraftMaid Home Addition or ADU Scope Is Off Track
- Doors that shimmy even after you adjust the hinges. Nearly always the box face has fallen out of square because the wall behind it moved or settled. In Pasadena’s older crawlspace additions, this shows up within two years if the foundation piers weren’t upgraded.
- Crown molding separating at the ceiling in an existing addition. Truss uplift is common in Pasadena’s hot-dry summers and cool winters. The ceiling lifts, the molding can’t follow, and you get a gap that reopens every October.
- You’re planning a garage conversion and the city flagged unpermitted work from a previous owner. KraftMaid cabinets won’t save a conversion that was never permitted. We’ve pulled permits on dozens of Pasadena ADUs and the fix usually means exposing framing, adding shear wall, and re-insulating before any finish work.
- Drawer slides that bind only when the AC runs hard. That’s humidity swings inside a poorly ventilated addition. KraftMaid’s maple boxes are stable, but extreme swings will show in the slides first.
- You want an ADU but the site plan says no because of the existing detached garage footprint. Pasadena’s ADU ordinance allows conversion of existing structures, but only if the structure meets current structural code. An old single-car garage with a KraftMaid cabinet wall and a slab on grade often needs full foundation retrofit.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

Here’s how pricing breaks down in Pasadena for what most people actually need.
- Full home addition (400-900 square feet) with KraftMaid cabinetry: $45,000-$130,000
- Detached ADU with KraftMaid kitchen and bath package: $90,000-$220,000
- Garage conversion to permitted ADU (including foundation and utility work): $30,000-$80,000
- KraftMaid cabinet installation alone, new construction or addition scope: $4,000-$13,000
- Matching existing KraftMaid runs with new boxes (per linear foot, installed): Included in the above, but we’ll line-item it so you see every dollar
Every number above includes labor, materials, permits pulled, inspections passed, and the written line-item price before any work starts. What drives the range on a Pasadena addition or ADU is usually the unseen stuff: foundation, drainage, utility trenching, and whether we’re tying into a 200-amp panel or upgrading from 100. KraftMaid cabinetry is the reliable part. The dirt and the drywall usually aren’t. We’ll give you the range, then we’ll tell you which end of it your house wants to live in.
DIY or Call Us?
If you’re swapping cabinet doors, adjusting a hinge, or shimming a drawer front on KraftMaid boxes, that’s an afternoon job and we’ll be the first to tell you to save the service call. But a home addition or ADU is not a parts project. This is structural, electrical, plumbing, and roofline work, and Pasadena’s permitting department will not let you proceed without stamped drawings on most additions over 120 square feet. Safety is the line. Lifting a wall, removing a load-bearing header, or excavation for a foundation are not jobs where we shrug and say “good luck.” People get hurt. That’s why every Sawyer Remodel Pasadena project runs with a written price, a live arrival time, and photo updates before and after. You know who’s coming, when they’re on site, and what it costs. If your KraftMaid cabinets are going into a new space and you want the build done right the first time, call (626) 657-5396 for a free estimate. We’ll walk the property, tell you what’s feasible, and put the number in writing.
FAQs

KraftMaid’s all-plywood box construction typically lasts 20 to 30 years with normal use, but the real variable in Pasadena is humidity control and whether the structure around them is sealed properly. We’ve seen 15-year-old KraftMaid boxes that look brand new next to 8-year-old boxes that are swollen because the addition wasn’t ventilated. Call (626) 657-5396 and we’ll give you an honest read on yours.
Yes, if the boxes are structurally sound and the new space is designed around their dimensions, we regularly remove, store, and reinstall KraftMaid cabinetry during remodels and conversions. Face frames and hinges need to match the new layout, and at some point the cost of modifying old boxes approaches the cost of new ones. We’ll show you both numbers before you commit.
A 400-square-foot addition typically runs 4 to 6 months from permit approval to final inspection, and a detached ADU runs 6 to 12 months depending on site work and utility upgrades. The permitting queue in Pasadena adds 6 to 10 weeks on its own, so we start the drawings early. We’ll give you a realistic schedule in writing before we dig the first hole.
We keep KraftMaid hinges, slides, shelf pins, and toe-kick stock on our trucks because that’s what fails first and what people need matched same-day. Full cabinet boxes are ordered per project from KraftMaid or Wellborn, and we also install Cambria, Silestone, and Kohler products across the same build. If you need a KraftMaid-compatible part matched, call (626) 657-5396 and we’ll have it identified before you hang up.
Written by Luca Romano, Owner & Lead Contractor, Sawyer Remodel Pasadena at Sawyer Remodel Pasadena, serving Pasadena and nearby areas.


